User contributions for Sabri
From Electrical Installation Guide
21 August 2012
- 12:2512:25, 21 August 2012 diff hist +18 m Conductor sizing and protection added link to new TOC pages
17 August 2012
- 13:0713:07, 17 August 2012 diff hist 0 m Selection of external Short Circuit Protection Device (SCPD) Review Format
- 13:0613:06, 17 August 2012 diff hist −14 m Selection of a Type 2 SPD Review Format
- 13:0513:05, 17 August 2012 diff hist −14 m Selection of a Type 1 SPD Review Format
- 13:0313:03, 17 August 2012 diff hist −26 m Common characteristics of SPDs according to the installation characteristics Review Format
- 13:0213:02, 17 August 2012 diff hist −2 m Common characteristics of SPDs according to the installation characteristics Review Format
- 13:0213:02, 17 August 2012 diff hist −69 m Elements of the protection system Review Format
- 12:5912:59, 17 August 2012 diff hist 0 m Elements of the protection system Review Format
- 12:5812:58, 17 August 2012 diff hist −14 m The Surge Protection Device (SPD) Review Format
- 12:5512:55, 17 August 2012 diff hist 0 m Effects on electrical installations Review Format
- 12:5512:55, 17 August 2012 diff hist −13 m Overvoltage characteristics of atmospheric origin Review Format
- 12:4012:40, 17 August 2012 diff hist −8 m Sizing the neutral conductor Review Format
- 12:3912:39, 17 August 2012 diff hist +6 m Equipotential conductor Review Format
- 12:3612:36, 17 August 2012 diff hist −2 m Protective conductor between MV/LV transformer and the Main Low Voltage Switchboard (MLVS) Review Format
- 12:3512:35, 17 August 2012 diff hist −2 m Protective conductor between MV/LV transformer and the Main Low Voltage Switchboard (MLVS) Review Format
- 12:3512:35, 17 August 2012 diff hist −2 m Sizing of protective earthing conductor Review Format
- 12:3412:34, 17 August 2012 diff hist −6 m Verification of the withstand capabilities of cables under short-circuit conditions Review Format
- 12:2712:27, 17 August 2012 diff hist −14 m Short-circuit current at the secondary terminals of a MV/LV distribution transformer Review Format
- 12:2612:26, 17 August 2012 diff hist −14 m Calculation of voltage drop in steady load conditions Review Format
- 12:2312:23, 17 August 2012 diff hist +6 m Busbar trunking systems Review Format
- 12:2012:20, 17 August 2012 diff hist −14 m Recommended simplified approach for cable sizing Review Format
- 12:1812:18, 17 August 2012 diff hist 0 m Practical values for a protective scheme Review Format
- 12:1412:14, 17 August 2012 diff hist 0 m Conductor sizing: methodology and definition Review Format
- 12:1212:12, 17 August 2012 diff hist +18 m Template:Menu Sizing and protection of conductors No edit summary
- 12:0912:09, 17 August 2012 diff hist −18 m Template:Menu Sizing and protection of conductors added link to new TOC pages
- 11:5411:54, 17 August 2012 diff hist +6 m IT system - Practical aspects Review Format
- 11:5111:51, 17 August 2012 diff hist −14 m IT system - Preliminary conditions Review Format
- 11:4911:49, 17 August 2012 diff hist −28 m TN system - Earth-fault current calculation Review Format
- 11:3911:39, 17 August 2012 diff hist +6 m Ground Fault Protection (GFP) Review Format
- 09:5809:58, 17 August 2012 diff hist −14 m Other protective measures against electric shocks Review Format
- 09:5709:57, 17 August 2012 diff hist −14 m IT system - Fault protection Review Format
- 09:5709:57, 17 August 2012 diff hist −2 m TN system - Principle Review Format
- 09:5609:56, 17 August 2012 diff hist −2 m TT system - Principle Review Format
- 09:5609:56, 17 August 2012 diff hist −14 m Measures of protection: two levels Review Format
- 09:5509:55, 17 August 2012 diff hist −14 m Measures of protection: two levels Review Format
- 09:5409:54, 17 August 2012 diff hist −14 m Additional protection: High sensitivity RCDs Review Format
- 09:5409:54, 17 August 2012 diff hist −2 m Direct and indirect contact Review Format
- 09:5309:53, 17 August 2012 diff hist −14 m Direct and indirect contact Review Format
- 09:5209:52, 17 August 2012 diff hist −2 m List of external influences Review Format
- 09:5009:50, 17 August 2012 diff hist −14 m Classification Review Format
- 09:4909:49, 17 August 2012 diff hist −3 m Distribution switchboards Review Format
- 09:4809:48, 17 August 2012 diff hist −14 m Installation and measurements of earth electrodes Review Format
- 09:4709:47, 17 August 2012 diff hist +12 m Choice of earthing method - implementation Review Format
- 09:4209:42, 17 August 2012 diff hist 0 m Selection criteria for the TT, TN and IT systems Review Format
- 09:4109:41, 17 August 2012 diff hist −53 m Characteristics of TT, TN and IT systems Review Format
- 09:3409:34, 17 August 2012 diff hist −14 m Number and localisation of MV/LV transformer substations Review Format
- 09:3309:33, 17 August 2012 diff hist −13 m Internal MV circuits Review Format
- 09:2909:29, 17 August 2012 diff hist −32 m Connection to the utility network Review Format
- 09:2409:24, 17 August 2012 diff hist −14 m Environmental impact Review Format
- 09:2109:21, 17 August 2012 diff hist −14 m Quality of supply voltage Review Format