General rules of electrical installation design
Connection to the MV utility distribution network
Connection to the LV utility distribution network
MV & LV architecture selection guide
LV Distribution
Protection against electric shocks
Sizing and protection of conductors
LV switchgear: functions & selection
Protection against voltage surges in LV
Energy Efficiency in electrical distribution
Power factor correction and harmonic filtering
Power harmonics management
Characteristics of particular sources and loads
PhotoVoltaic (PV) installation
Residential electrical installations
ElectroMagnetic Compatibility (EMC)

The choice of equipment is step 3 in the design of an electrical installation. The aim of this step is to select equipment from the manufacturers’ catalogues. The choice of technological solutions results from the choice of architecture.

List of equipment to consider:
  • MV/LV substation,
  • MV switchboards,
  • Transformers,
  • LV switchboards,
  • Busbar trunking,
  • UPS units,
  • Power factor correction and filtering equipment.
Criteria to consider:
  • Atmosphere, environment,
  • Service index,
  • Offer availability per country,
  • Utilities requirements,
  • Previous architecture choices.

The choice of equipment is basically linked to the offer availability in the country. This criterion takes into account the availability of certain ranges of equipment or local technical support.
The detailed selection of equipment is out of the scope of this document.